You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-17-1743-ADMIN-TWNHL-30894
Header Information
Bid Number:
BD-17-1743-ADMIN-TWNHL-30894
Description:
New Highway Facility
Bid Opening Date:
10/10/2018 02:00:00 PM
Purchaser:
Andrea Llamas
Organization:
Town of Buckland
Department:
ADMIN1 - Town Administrator
Location:
TWNHL - Town Hall
Fiscal Year:
17
Type Code:
NS
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
09/05/2018 02:00:00 PM
Info Contact:
Roy Brown Architects at rsba85@yahoo.com
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Friday, September 14, 2018 at 10:00 a.m. 2 Sears Street, Buckland MA 01370
Bulletin Desc:
All labor and materials necessary for the construction of a new highway facility, which includes demolition of existing buildings, construction of new rigid frame metal building, construction of new pole barn building, renovations to utilities in accordance with new site layout, site grading and finishes, etc. Estimated construction cost is two million one hundred thousand dollars ($2,100,000) DCAM qualifications in the General Construction category will be required.
Ship-to Address:
Heather Butler
17 State Street
Town Hall
Buckland, MA 01370
US
Email: twnadmin@town.buckland.ma.us
Phone: (413)625-6330
FAX: (413)625-8570
Bill-to Address:
Heather Butler
17 State Street
Town Hall
Buckland, MA 01370
US
Email: twnadmin@town.buckland.ma.us
Phone: (413)625-6330
FAX: (413)625-8570
Print Format:
Bid Print
File Attachments:
Buckland Highway Facility.ntb.pdf
Form Attachments:
Required Quote Attachments
Item Information
Item # 1: ( 72-13 - 00 )
All labor and materials necessary for the construction of a new highway facility, which includes demolition of existing buildings, construction of new rigid frame metal building, construction of new pole barn building, renovations to utilities in accordance with new site layout, site grading and finishes, etc. Estimated construction cost is two million one hundred thousand dollars ($2,100,000) DCAM qualifications in the General Construction category will be required.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
MASS_MASS_AWS_PROD_BUYSPEED_1_bso
Quote #
Description
Date Last Modified
Status