You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-27-2103-CO111-CO111-133569
Header Information
Bid Number:
BD-27-2103-CO111-CO111-133569
Description:
RFQ CMAR new Triton Regional-Middle High School
Bid Opening Date:
09/23/2026 09:00:00 AM
Purchaser:
Richard J Poor
Organization:
Triton Regional School District
Department:
CO111 - Central Office
Location:
CO111 - Central Office
Fiscal Year:
27
Type Code:
NS
Allow Electronic Quote:
No
Alternate Id:
Required Date:
09/23/2026
Available Date :
09/23/2026 12:00:00 AM
Info Contact:
dshaer@pmaconsultants.com
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
RFQ for CMR Services for construction/add-reno of a new middle-high school for Triton Regional School District to be built on the active campus located at 112 Elm St, Byfield, MA 01922. The RFQ will be available at 9 am on Wed 9/23/26 via projectdoc.com, ID#262092. Projectdoc 978-499-9014 is available to answer questions re: accessing the RFQ
Ship-to Address:
Richard J Poor
112 Elm Street
Byfield, MA 01922
US
Email: richard.poor@tritonschools.org
Phone: (978) 462-8171
Bill-to Address:
Richard J Poor
112 Elm Street
Byfield, MA 01922
US
Email: richard.poor@tritonschools.org
Phone: (978) 462-8171
Print Format:
File Attachments:
2026-09-16 TRSD Middle-High Sch Local Ad CMR RFQ.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Item Information
Item # 1: ( 72-12-14-06 )
The Triton Regional School District is issuing a Request for Qualifications (RFQ) for Construction Manager at Risk Services (under MGL C. 149A) for the new Regional Middle-High School at 114 Elm Street, Byfield, MA 01922. This project is being funded in part through a grant from the Massachusetts School Building Authority (MSBA). Estimated total cost of construction is $250M-$300M with estimated project construction duration of 61 months. The project is currently in the early phases of the Feasibility Study (FS). Preliminary Design Program submission is anticipated in Oct. 2026 with Preferred Schematic Report (PSR) submission anticipated in Feb. 2027. Successful CMR bidder will be required to provide a construction cost estimate for inclusion with the PSR submission. PSR estimating documents anticipated to be issued Dec. 17, 2026. Current middle-high school is a 3-level concrete structure of ~286,368 SF. The Project includes vetting 10+ construction build options during FS based on enrollments of up to 1,070 students grades 6 to 12 or 895 students grades 7 to 12. For additional information please see the full RFQ which will be available at 9:00AM on Wednesday, September 23, 2026, at www.projectdoc.com EXISTING www.projectdog.com accounts WILL NOT TRANSFER to www.projectdoc.com. Users must create a new Projectdoc.com account which is free to do. Click "Create FREE Account" to create new account. Enter Project ID 262092 to access project related documents and complete all required submissions. The deadline for submission of Statement of Qualifications (SOQ) is Friday, October 9, 2026 at 3:00PM. SOQs must be submitted electronically at www.projectdoc.com. The District anticipates completion of the prequalification process by October 23, 2026. Only construction management at risk firms achieving an acceptable rating and prequalified by the Committee as defined in Section D "Evaluation Criteria of Selection" within the RFQ will be selected to proceed to the Request for Proposal (RFP) phase.
U N S P S C Code:
72-12-14
Specialized public building construction services
72-12-14-06
School building construction service
72-12-14-06
School building construction service
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status