You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-27-1348-PD34-PD45-134756
Header Information
Bid Number:
BD-27-1348-PD34-PD45-134756
Description:
RFQ General and FSB Contractor for New Dispatch Facility
Bid Opening Date:
11/04/2026 01:00:00 PM
Purchaser:
Katelyn Barker
Organization:
Town of Westborough
Department:
PD34 - Police Department
Location:
PD45 - Police Department
Fiscal Year:
27
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
Available Date :
10/23/2026 11:13:34 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
Renovation of a two-story structure, with basement, located at 20 Phillips Street in Westborough, MA. Construction includes gut renovations to the facility, an addition of an elevator, installation of new mechanical, electrical, and plumbing systems, windows, roofing, finishes as well as exterior site work. The construction duration is approximately 12 months. Scope also includes coordination with existing/new site utilities and coordination with the district's radio/dispatch vendors.
Ship-to Address:
Jaclyn Bonner
Westborough Town Hall
34 West Main St
westborough, MA 01581
US
Email: skhan@westboroughma.gov
Phone: (508) 871-5153
Bill-to Address:
Jaclyn Bonner
Westborough Town Hall
34 West Main St
westborough, MA 01581
US
Email: skhan@westboroughma.gov
Phone: (508) 871-5153
Print Format:
Bid Print
File Attachments:
Legal Ad_RECC
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Item Information
Item # 1: ( 72-13 - 00 )
REQUEST for GENERAL AND FILED SUBBID CONTRACTOR QUALIFICATIONS Renovation of a two-story structure, with basement, located at 20 Phillips Street in Westborough, MA. Construction includes gut renovations to the facility, an addition of an elevator, installation of new mechanical, electrical, and plumbing systems, windows, roofing, finishes as well as exterior site work. The construction duration is approximately 12 months. Scope also includes coordination with existing/new site utilities and coordination with the district's radio/dispatch vendors.
U N S P S C Code:
72-13-00
General building construction
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status