You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-27-1158-NBPT3-NBPT3-134877
Header Information
Bid Number:
BD-27-1158-NBPT3-NBPT3-134877
Description:
IFB No. 27-07 Bartlet Mall Restoration Project
Bid Opening Date:
12/17/2026 11:00:00 AM
Purchaser:
Tom Watkins
Organization:
City of Newburyport
Department:
NBPT3 - Dept of Public Services
Location:
NBPT3 - Water/Sewer Business
Fiscal Year:
27
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
10/28/2026 10:00:00 AM
Info Contact:
twatkins@newburyportma.gov - download bid documents at www.cityofnewburyport.com/bids
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A pre-bid meeting/site visit will take place on Tuesday, November 10 at 1:00 PM. Interested bidders shall meet at the Bartlet Mall located at 153 Auburn Street, Newburyport, MA 01950.
Bulletin Desc:
Scope of Work includes: installation of erosion controls, pond dewatering, fountain removal, restoration, and re-installation, installation of water quality pipes and methane venting system, installation of liner system consisting of geogrid, HDPE/LDPE liner, Armor Stone, and Benthic Sediment, installation of wet well, pump, drywells, bedrock well system, and pumphouse, grading and installation of walkway materials as noted, installation of dock, installation of plantin
Ship-to Address:
Tom Watkins
16 Perry Way
Water/Sewer Business Office
Newburyport, MA 01950
US
Email: twatkins@cityofnewburyport.com
Phone: (978) 465-4412
Bill-to Address:
Tom Watkins
16 Perry Way
Water/Sewer Business Office
Newburyport, MA 01950
US
Email: twatkins@cityofnewburyport.com
Phone: (978) 465-4412
Print Format:
Bid Print
Required Quote Attachments
Desired Attachment Name
Description
Item Information
Item # 1: ( 72-14 - 00 )
Scope of Work for the Bartlet Mall Restoration Project includes but is not limited to: installation of erosion controls, pond dewatering, fountain removal, restoration, and re-installation, installation of water quality pipes and methane venting system, installation of liner system consisting of geogrid, HDPE/LDPE liner, Armor Stone, and Benthic Sediment, installation of wet well, pump, drywells, bedrock well system, and pumphouse, grading and installation of walkway materials as noted, installation of dock, installation of planting around the perimeter of the pond, restoration of upland as needed, and any potential bid alternates as listed.
U N S P S C Code:
72-14-00
Heavy construction services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status