Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-27-1153-ENG01-ENG01-134214

Header Information

Bid Number: BD-27-1153-ENG01-ENG01-134214 Description: ED 2026-11 (RE-BID) Bid Opening Date: 10/29/2026 09:00:00 AM
Purchaser: KATLYN LEBOLD Organization: City of Marlborough
Department: ENG01 - Engineering Division Location: ENG01 - Engineering Division
Fiscal Year: 27 Type Code: NS - Non-Statewide Solicitation Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  10/14/2026 09:00:00 AM
Info Contact: mdascoli@marlborough-ma.gov Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc: Contract No. ED 2026-11, Maple Street Park (Re-Bid) The work shall include, but not be limited to, site demolition and preparation; installation of concrete pavers; installation of irrigation; tree planting; final grading; and restoration of all areas disturbed by construction activities. Estimated project cost is approximately $98,000.00.
Ship-to Address: KATLYN MILLER
135 Neil St.
Marlborough, MA 01752
US
Email: kmiller@marlborough-ma.gov
Phone: (508) 624-6910
Bill-to Address: KATLYN MILLER
135 Neil St.
Marlborough, MA 01752
US
Email: kmiller@marlborough-ma.gov
Phone: (508) 624-6910
Print Format: Bid Print
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   ( 72-13  -  00 )   Contract No. ED 2026-11, Maple Street Park (Re-Bid) for the Department of Public Works-Engineering Division in accordance with the documents prepared by the City of Marlborough and Highpoint Engineering, Inc. The project consists of furnishing all labor, equipment, tools, supervision, and incidental materials necessary to complete the proposed site improvements in accordance with the construction plans and Contract Documents. The work shall include, but not be limited to, site demolition and preparation; installation of concrete pavers; installation of irrigation; tree planting; final grading; and restoration of all areas disturbed by construction activities. Materials specifically identified on the construction plans as City-furnished materials shall be provided by the City, with the Contractor responsible for coordinating, handling, protecting, installing, and incorporating such materials into the completed work. The Contractor shall also be responsible for protecting existing utilities and improvements to remain, removing and properly disposing of construction debris, and leaving the site in a clean, safe, and fully restored condition upon completion. The estimated project cost is approximately $98,000.00. Bid Forms and Contract Documents will be available electronically on Projectdoc.com under Project ID # 262401, beginning October 14, 2026 at 9:00 AM. This project is being electronically bid. All bids must be prepared and submitted online through Projectdoc.com. Hard copy bids will not be accepted by the Awarding Authority. Electronic Sealed Bids will be received until 9:00 AM on October 29, 2026.
U N S P S C Code: 72-13-00
   General building construction
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status