Bid Solicitation: BD-27-1142-PFD01-PFD01-134734

Header Information

Bid Number: BD-27-1142-PFD01-PFD01-134734 Description: Project #7244 North End Community Center IFB Bid Opening Date: 11/17/2026 12:00:00 PM
Purchaser: BID COUNTER Organization: City of Boston
Department: PFD01 - Public Facilities Department Location: PFD01 - Public Facilities Department
Fiscal Year: 27 Type Code: SS - Statewide Solicitation Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  10/26/2026 12:00:00 AM
Info Contact: Bid.info@boston.gov Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc: The North End Community Center project consists of the demolition of the existing Mirabella Pool facility and the construction of a new four-story, BCYF community center. The project also includes an aquatic facility with two new pools and spray deck. The project is designed to achieve LEED Silver certification or better, and Net Zero Ready performance and is further detailed in the plans and specifications.
Ship-to Address: PFD Bid Room
26 Court Street
1st Floor
Boston, MA 02108
US
Email: bid.info@boston.gov
Phone: (617) 635-4809
Bill-to Address: PFD Bid Room
26 Court Street
1st Floor
Boston, MA 02108
US
Email: bid.info@boston.gov
Phone: (617) 635-4809
Print Format: Bid Print
File Attachments: Project #7244 North End Community Center
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description

Item Information

1-5 of 11
1  2  3 
Item # 1:   ( 72-13  -  00 )   The North End Community Center project consists of the demolition of the existing Mirabella Pool facility and the construction of a new four-story, BCYF community center. The project also includes an aquatic facility with two new pools and spray deck. The project is designed to achieve LEED Silver certification or better, and Net Zero Ready performance and is further detailed in the plans and specifications
U N S P S C Code: 72-13-00
   General building construction
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 72-10  -  22 )   The North End Community Center project consists of the demolition of the existing Mirabella Pool facility and the construction of a new four-story, BCYF community center. The project also includes an aquatic facility with two new pools and spray deck. The project is designed to achieve LEED Silver certification or better, and Net Zero Ready performance and is further detailed in the plans and specifications
U N S P S C Code: 72-10-22
   Electrical services
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 72-10  -  23 )   The North End Community Center project consists of the demolition of the existing Mirabella Pool facility and the construction of a new four-story, BCYF community center. The project also includes an aquatic facility with two new pools and spray deck. The project is designed to achieve LEED Silver certification or better, and Net Zero Ready performance and is further detailed in the plans and specifications
U N S P S C Code: 72-10-23
   Plumbing and heating and air conditioning
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 72-10  -  24 )   The North End Community Center project consists of the demolition of the existing Mirabella Pool facility and the construction of a new four-story, BCYF community center. The project also includes an aquatic facility with two new pools and spray deck. The project is designed to achieve LEED Silver certification or better, and Net Zero Ready performance and is further detailed in the plans and specifications
U N S P S C Code: 72-10-24
   Painting and paper hanging
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 72-15  -  26 )   The North End Community Center project consists of the demolition of the existing Mirabella Pool facility and the construction of a new four-story, BCYF community center. The project also includes an aquatic facility with two new pools and spray deck. The project is designed to achieve LEED Silver certification or better, and Net Zero Ready performance and is further detailed in the plans and specifications
U N S P S C Code: 72-15-26
   Roofing and siding and sheet metal services
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 