You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: BD-27-1134-CHA01-CHA01-134478
Header Information
Bid Number:
BD-27-1134-CHA01-CHA01-134478
Description:
Property Renovation 2 bedroom to 3 bedroom
Bid Opening Date:
11/05/2026 02:00:00 PM
Purchaser:
Rock-Andral Ludger
Organization:
Cambridge Housing Authority
Department:
CHA01 - Cambridge Housing Authority
Location:
CHA01 - Cambridge Housing Authority
Fiscal Year:
27
Type Code:
SS - Statewide Solicitation
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
11/05/2026
Available Date :
10/21/2026 03:59:59 PM
Info Contact:
procurement@cambridge-housing.org
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
A site visit will be scheduled for October 22, 2026, at 11:00 AM, 149 Willow St, Cambridge, MA 02139.
Bulletin Desc:
The Cambridge Housing Authority (CHA), as Owner and Managing Agent for its affiliate properties, is soliciting quotes from qualified vendors to renovate a residential unit at 149 Willow St in Cambridge, Massachusetts, in accordance with the documents prepared by the Cambridge Housing Authority.
Ship-to Address:
Rock-Andral Ludger
362 Green Street
3rd Floor
Cambridge , MA 02139
US
Email: rludger@cambridge-housing.org
Phone: (617) 520-6220
Bill-to Address:
Rock-Andral Ludger
362 Green Street
3rd Floor
Cambridge , MA 02139
US
Email: rludger@cambridge-housing.org
Phone: (617) 520-6220
Print Format:
Bid Print
File Attachments:
CHA Advertisment Form 149 Willow St re-bid.docx
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Item Information
Item # 1: ( 72-10 - 00 )
The Cambridge Housing Authority (CHA), as Owner and Managing Agent for its affiliate properties, is soliciting quotes from qualified vendors to renovate a residential unit at 149 Willow St in Cambridge, Massachusetts, in accordance with the documents prepared by the Cambridge Housing Authority. The work will include drywall, insulation, kitchen replacement, bathroom replacement, flooring, doors, ceiling refinishing, painting, and code compliance. The awarded contractor will be responsible for providing CHA with all labor, materials, and equipment necessary to complete the project in accordance with the terms of the specification outlined in the scope of work and the document issued by the Cambridge Housing Authority. The awarded contractor will also be responsible for providing complete source removal as well as coordinating hazardous material testing if required. The construction period will be thirty (30) calendar days from Notice to Proceed
U N S P S C Code:
72-10-00
Building construction and support and maintenance and repair
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status