Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-27-1022-DMH08-8210C-135631

Time remaining

Header Information

Bid Number: BD-27-1022-DMH08-8210C-135631 Description: 2027-013A Haskell Building Partial Roof Replacement CHPT149 Bid Opening Date: 12/18/2026 02:00:00 PM
Purchaser: KELSEY SANTOS Organization: Department of Mental Health
Department: DMH08 - STATEWIDE Location: 8210C - STATEWIDE NON POS
Fiscal Year: 27 Type Code: NS - Non-Statewide Solicitation Allow Electronic Quote: Yes
Alternate Id: 2027-013A CHPT 149  Required Date: Available Date :  11/25/2026 09:00:00 AM
Info Contact: Fred Bergstrom cell: (617) 997-9691. fred.e.bergstrom@mass.gov Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A MANDATORY Pre-Bid Conference will be held at 10:00AM on Wednesday 12/09/2026. Contractors should meet the Project Engineer at the Main Lobby of One Prince Street Northampton, MA 01060-3600 to review and discuss project details.
Bulletin Desc: Contractor is responsible for removing the existing roof in its entirety and replacing it with a new roof assembly. All work is to be performed in accordance with the project specifications and drawings located in Part IV of the Bid Documents.
Ship-to Address: Sharon Moody
Office of Engineering & Facilities Management
Hadley Building
Westborough, MA 01581
US
Email: sharon.moody@massmail.state.ma.us
Phone: (617) 626-8025
Bill-to Address: Sharon Moody
Office of Engineering & Facilities Management
Hadley Building
Westborough, MA 01581
US
Email: sharon.moody@massmail.state.ma.us
Phone: (617) 626-8025
Print Format:
File Attachments: 2027-013A - Bid Documents Post to COMMBUYS.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
SBPP (Small Business Purchasing Program) Eligible?: YES
See SBPP requirements and exceptions at www.mass.gov/sbpp :

Item Information

Item # 1:   ( 72-13  -  00 )   Contractor is responsible for removing the existing roof in its entirety and replacing it with a new roof assembly. All work is to be performed in accordance with the project specifications and drawings located in Part IV of the Bid Documents.
U N S P S C Code: 72-13-00
   General building construction
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 72-10  -  16 )   Contractor is responsible for removing the existing roof in its entirety and replacing it with a new roof assembly. All work is to be performed in accordance with the project specifications and drawings located in Part IV of the Bid Documents.
U N S P S C Code: 72-10-16
   Roofing and siding and sheet metal work
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 72-15  -  26 )   Contractor is responsible for removing the existing roof in its entirety and replacing it with a new roof assembly. All work is to be performed in accordance with the project specifications and drawings located in Part IV of the Bid Documents.
U N S P S C Code: 72-15-26
   Roofing and siding and sheet metal services
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status