Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: BD-24-1402-SDH01-SDH01-94256

Time remaining

Header Information

Bid Number: BD-24-1402-SDH01-SDH01-94256 Description: 390 Urethane Flake Flooring System Bid Opening Date: 11/22/2023 02:00:00 PM
Purchaser: Mary Pastore Organization: Hampden Sheriff's Department
Department: SDH01 - Sheriff's Department Hampden Location: SDH01 - Sheriff's Department Hampden
Fiscal Year: 24 Type Code: NS - Non-Statewide Solicitation Allow Electronic Quote: No
Alternate Id:   Required Date: Available Date :  10/23/2023 10:00:00 AM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc: Sealed bids for Urethane Flake Flooring System. Bid documents can be received by emailing Mary Pastore mary.pastore@sdh.state.ma.us A walk through at the Western Mass Regional Womens Correctional Center, 701 Center Street, Chicopee, MA 01013 is scheduled for Wednesday, November 8, 2023 at 11:00 AM. Bidders must confirm attendance no later than Friday, November 3, 2023 at 2:00 PM by contacting Mary Pastore (413) 858-0121. Clearance paperwork will need to be completed.
Ship-to Address: Ann Speziali
627 Randall Road
Ludlow, MA 01056
US
Email: ann.speziali@sdh.state.ma.us
Phone: (413) 858-0119
Bill-to Address: Ann Speziali
627 Randall Road
Ludlow, MA 01056
US
Email: ann.speziali@sdh.state.ma.us
Phone: (413) 858-0119
Print Format:
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   ( 72-13  -  00 )   Sealed bids for Urethane Flake Flooring System. Bid documents can be received by emailing Mary Pastore mary.pastore@sdh.state.ma.us A walk through at the Western Mass Regional Womens Correctional Center, 701 Center Street, Chicopee, MA 01013 is scheduled for Wednesday, November 8, 2023 at 11:00 AM. Bidders must confirm attendance no later than Friday, November 3, 2023 at 2:00 PM by contacting Mary Pastore (413) 858-0121. Clearance paperwork will need to be completed.
U N S P S C Code: 72-13-00
   General building construction
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status