Bid Number: BD-23-2126-AWD00-CHUR-134709 Description: Qualifications for Water Treatment Plant Construction Bid Opening Date: 01/04/2027 02:00:00 PM
Purchaser: Greg Woods Organization: Auburn Water District Inactive
Department: AWD002 - Auburn Water Distsrict Location: CHUR - Church St
Fiscal Year: 23 Type Code: SS Allow Electronic Quote: No
Alternate Id:   Required Date: 11/18/2026 Available Date :  10/28/2026 02:00:00 PM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc: Request for Qualifications for construction of new water treatment facility. The Work consists of construction of a 1.3 MGD PFAS removal facility located at 76 Church St, Auburn, MA. The primary treatment utilizes pressure filtration units with Granular Activated Carbon media. Work includes chemical feed systems, backwash residuals holding tank below the first floor within the building footprint, restroom, HVAC, plumbing, fire protection system, electrical systems and associated site work.
Ship-to Address: Bill-to Address: Print Format: Bid Print
File Attachments: AWD Church St_RFQ_GC and Subs_Advertisement.pdf
8158 AWD Church Street Prequalification RFQ for General Contractors
8158 AWD Church Street Prequalification RFQ for Subcontractors
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description

Item Information

Item # 1:   ( 47-10  -  15 )   The Auburn Water District hereby requests qualifications from prospective General Contractors and Sub-Contractors for the construction of the new 1.3 million gallon per day (mgd) Church Street PFAS Water Treatment Facility in accordance with M.G.L. C. 149, ss 44D. The project with an estimated cost of twelve million five hundred thousand dollars ($12,500,000) includes construction of the new concrete masonry unit (CMU) water treatment facility with GAC filter vessels for PFAS removal, chemical feed systems, backwash residuals holding tank below the first floor within the proposed building footprint, restroom, HVAC, plumbing, fire protection system, and electrical systems. Site work includes all below grade utilities, grading, a new paved driveway and gravel driveway area for vehicular access and chemical delivery, stormwater collection and treatment, and selective demolition of existing chemical feed equipment and replacement of well pumps and motors within the existing well pump buildings. Work shall be completed within 570 consecutive calendar days of the date fixed in the Notice to Proceed.
U N S P S C Code: 47-10-15
   Water treatment and supply equipment
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status